Commercial Property For Sale
40 Chisholm |
Available July 2006

CONDO/WAREHOUSE DEVELOPMENT
NORWALK BLOCK ~ ST. ALBERT
GENERAL:
- Building and development permit
application and fees not included.
- Course of construction insurance
included.
- Concrete testing and soil
compaction testing is not included.
- Engineered Behlen Building
drawings included.
- Architectural, structural,
mechanical and electrical engineering and drawings are
not included.
- Temporary construction power
included.
- Temporary sanitary facilities
included.
- All utilities to be arranged and
paid for by Owner.
SITEWORK:
- Site development including
stripping, grading, gravelling, landscaping, fencing or
accesses are not included.
- Site is assumed to be prepared and
level to 1-0 below finish floor elevation.
- Excavation for grade beam and
backfill with excavated material is included. Digging
and backfill with frozen material is not included.
- Pile tailings to be stockpiled on
site for disposal by Owner.
- Finish grading around building by
Owner.
CONCRETE:
- Foundations to consist of
reinforced concrete grade beam on reinforced cast in
place concrete piles with top of grade beam flush with
the finish floor elevation in accordance with drawings
S-1 to S-5 including the piles under the outside edge of
the sidewalk.
- Owner to be responsible for
providing a geotechnical report for the site and arrange
and pay for the geotechnical engineers site supervision
costs during installation of the piling.
- Provide 4 void form under grade
beams.
- Provide 2 rigid grade beam
insulation to inside perimeter below floor slab.
- Supply and install standard black
steel anchor bolts.
- Sidewalk and floor slab not
included.
MASONRY:
- Supply and install masonry facing
to match the existing building.
- Masonry work to be done in the
spring of 2006 when weather permits.
CONDO/WAREHOUSE
DEVELOPMENT
NORWALK BLOCK ~ ST. ALBERT
CARPENTRY AND FINISHING:
- Exterior walls to be framed with
steel studs, sheathing, insulation, vapor barrier and
fire rated drywall as noted on the drawings.
- All drywall to be taped and sanded
ready for paint.
- Owner to provide suitably heated
interior environment to permit finishing of drywall.
- We have included for 2x4 wood
frame construction behind sign bands c/w 7/16 OSB
sheathing.
- Interior demising walls not
included.
- Finish painting of doors or
drywall not included.
DOORS AND WINDOWS:
- Ten 10 x 14 steel sectional
insulated overhead doors (R16) c/w 3 track, 2-0 high
lift, manual chain hoist and weatherstrip.
- Eleven 3 x 7 hollow metal
insulated doors and pressed steel frames c/w NRP butt
hinges, deadbolt, latchset, threshold, weatherstrip,
sweep and check chain.
- Ten aluminum entry doors to be a
3 x 7 to match the existing building doors.
- Thirty exterior white vinyl
Durabuilt windows to match the existing building
windows.
METAL BUILDING:
- Behlen Industries single slope
pre-engineered steel building in general accordance with
the drawings.
- Design loads to 1997 ABC plus 1
psf collateral load.
- Clear span interior rigid frames
and post and beam end frames.
- Structural steel to have one coat
of standard gray primer.
- Structure to bear directly on
concrete foundation without grout or shims.
- North and south sides of building
to be braced with portal frames similar to the existing
building. Torsional bracing from the endwalls to the
roof structure eliminates the requirement for cross
bracing on both ends.
- Roof to be 24 ga. galvalume
standing seam type c/w 9 (R-30) insulation consisting
of one layer of 3 faced fiberglass metal building
insulation and one layer of 6 unfaced fiberglass rolled
insulation.
- Exterior walls on the south side
and approximately 46 of each end to be 26 ga. Behlen
Detlaspan profile (similar to Varco-Pruden Vee Rib)
prefinished in the manufacturers standard color c/w 6
(R-20) faced fiberglass metal building insulation. We
have also included the 2-0 high stitch on fascia to
both ends. Please note that the Behlen panel is smooth
and not embossed like the Varco-Pruden panel.
METAL BUILDING:
- Exterior walls on the north side
and approximately 14 of each end to be 22 ga. Vicwest
Steel AD300R hidden fastener panels in manufacturers
standard colors, similar to the Varco-Pruden panels on
the existing building. Please note that the Vicwest
panel is also smooth. We have also included the
additional stitch on alternate color fascia similar in
design to the existing building on the north side and
east and west ends.
- Standard eave gutter and
downspouts to grade.
Lease for only $1,500/month
includes taxes and condo fees
Proposed Budget
|
Item |
Yearly |
Monthly |
Yearly Per Unit |
Monthly Per Unit |
|
|
|
|
|
|
|
Security Lighting ~ Power and Maintenance |
$ 600.00 |
$ 50.00 |
$ 60.00 |
$ 5.00 |
|
Car Park Maintenance |
$ 300.00 |
$ 25.00 |
$ 30.00 |
$ 2.50 |
|
Line Painting |
$ 200.00 |
$ 16.67 |
$ 20.00 |
$ 1.67 |
|
Drain Cleaning |
$ 450.00 |
$ 37.50 |
$ 45.00 |
$ 3.75 |
|
Snow Removal |
$ 1,200.00 |
$ 100.00 |
$ 120.00 |
$ 10.00 |
|
Meter Room Maintenance |
$ 200.00 |
$ 16.67 |
$ 20.00 |
$ 1.67 |
|
Landscaping |
$ 500.00 |
$ 41.67 |
$ 50.00 |
$ 4.17 |
|
Grass Cutting |
$ 400.00 |
$ 33.33 |
$ 40.00 |
$ 3.33 |
|
Fence Maintenance |
$ 300.00 |
$ 25.00 |
$ 30.00 |
$ 2.50 |
|
Building Shell Maintenance |
$ 500.00 |
$ 41.67 |
$ 50.00 |
$ 4.17 |
|
Windows & Door Seals & Closers |
$ 500.00 |
$ 41.67 |
$ 50.00 |
$ 4.17 |
|
Insurance Policy |
$ 3,625.00 |
$ 302.06 |
$ 362.50 |
$ 30.21 |
|
Extraordinary Expenses |
$ 500.00 |
$ 41.67 |
$ 50.00 |
$ 4.17 |
|
Bank Charges |
$ 150.00 |
$ 12.50 |
$ 15.00 |
$ 1.25 |
|
Annual Audit |
$ 1,000.00 |
$ 83.33 |
$ 100.00 |
$ 8.33 |
|
Mail/Office Expenses |
$ 50.00 |
$ 4.17 |
$ 5.00 |
$ 0.42 |
|
Administrative/Management (15%) |
$ 1,556.25 |
$ 129.69 |
$ 155.63 |
$ 12.97 |
|
Reserve Fund Contribution |
$ 3,000.00 |
$ 250.00 |
$ 300.00 |
$ 25.00 |
|
|
|
|
|
|
|
TOTALS |
$15,031.25 |
$1,252.60 |
$ 1,503.13 |
$ 125.28 |
|
|
|
|
|
|

|
 |